300 George Stage 1
Brisbane, Queensland

Project Details

CE Group Mechanical Electrical team were engaged to deliver the mech/elec portion of the works for this project.

The hotel will be the first of the three buildings to be constructed and will include a seven-level basement, four-level podium, and 305 rooms. Future stages of the development will include construction of a 40-level commercial office tower and an 82-level residential tower, which when completed will be Brisbane’s second tallest building, standing 262 metres high.

CE Group were engaged by Ellis Air to complete the Mechanical Electrical package of work including all HVAC systems in the podiums, essential ventilation throughout, the central energy plant contained in the Office Tower, and the new W Hotel. CE Group also designed, built and installed all of the mechanical switchboards for the project as well as designing and commissioning the mechanical electrical control systems.

Summary

Location

Brisbane, QLD

Client

Ellis Air

Project Completion

2020

Value

##.#m

Man hours

6,800