The Brisbane Airport is responsible for the safe transportation of over 20 million passengers per year. As part of their ongoing commitment to quality, it was deemed necessary to remove and reinstate several of the domestic terminal’s existing Air Circuit Breakers.
CE Group was contracted to perform a series of critical changeovers in the domestic terminal’s main switchboard. The importance of this project resulted in a comprehensively detailed analysis of the work requirements and associated risks surrounding the task. CE Group worked closely with BAC to mitigate and control any potential risks. The project’s focus was on a safe delivery and a minimisation to passenger disruption. This was considered hugely successful by both parties and resulted in the safe completion of all works.
Summary
Location
Client
BAC
Project Completion
2020
Value
##.#m