Our
Projects

Karumba Waste Water Plant

CEQ was engaged to provide the base building electrical, along with the process control and data acquisition systems. The base building works include mains installation, switchboards, generator systems and UPS supply, general light and power and lighting protection systems. CEQ designed and manufactured the switchboards within our Loganholme Head Office factory.

 

The Process Control System was a design and construct contract based on a functional description provided by the client. The plant automation and programming was undertaken by CEQ to industry best practice, including supply and programming of the site SCADA system.

Related Projects