Project Details
CE Group was engaged by Kilcoy Pastoral Company (KPC) to provide a turn-key electrical solution for the Carcass Conveyor system which forms part of a new boning facility at the Kilcoy processing plant.
The scope of works included working directly with KPC to design, install and commission a stand-alone MCC for the Carcass Conveyor system, including PLC design and programming married with Human Machine Interface (HMI) design and integration.
CE Group Designed and manufactured the new MCC (Motor Control Centre) in-house and worked closely with KPC to ensure all design parameters were met. This project was run concurrently with various other work fronts within the facility and required flexibility and communication from CE Group works teams to deliver within the scheduled time frames.
Summary
Location
Client
Kilcoy Pastoral Company
Project Completion
2020
Value
##.#m
Man hours
2,500