Latest
News

Working for Logan in Logan

21 June 2018

CEQ Australia is proud to announce its success in the award of the Logan Water Infrastructure Alliance Alfred Street Pump Station Switchboard and Switchroom projects.  The Slacks Creek-based project involves the supply and installation of a new demountable switchroom, manufacture of a replacement switchboard, and upgrade to the existing electrical infrastructure at the pump station.  The 22-week project provides CEQ with a platform to continue to demonstrate its strength in Water and Infrastructure based project delivery.  CEQ is proud to partner with the LWIA in the installation, maintenance and upgrade of essential public infrastructure.

Information around the LWIA and their works can be found here.

Latest News

6 May

Angau Memorial Hospital

The ANGAU Memorial Hospital provides critical health services for the city of Lae as well as the broader Momase region. The Australian Government, represented by the Department of Foreign Affairs and Trade is working in partnership with the Government of Papua New Guinea to redevelop the ANGAU Memorial Hospital in

Read Article
22 Mar

CUBIC Switchboards

As the demand for CUBIC switchboards increases in the industry , CEQ has responded by demonstrating its ability to design and manufacture CUBIC modular boards to client specification.  The boards provide an element of flexibility for the owner, with increased upgrade and alteration ability, at less cost, and within shorter

Read Article
18 Feb

LMWQCC – 3 years strong

The Lower Molonglo Water Quality Control Centre has become a familiar home for CEQ’s ACT Operations team in recent years. After 3 years of working onsite and ZERO LTI’s to date, CEQ is continuing its strong relationship with Downer Utilities with the successful award of the Electrical Works contract for

Read Article
2 Jan

Electrical Supervisors Required

CEQ is seeking Electricians with Industrial or Heavy Commercial experience for immediate commencement on project works in PNG. Multiple positions are available for a duration of approximately 6 weeks. Applicants should hold a valid passport with a minimum 6 months validity, and be able to present for PNG Visa application

Read Article